ROADS OF SERBIA: 15,529 Vehicles Pass through Toll Station Pakovraće

Within 48 hours from the opening for traffic of the new motorway E-763 section from Preljine to Pakovraće, 15,529 vehicles passed through the new toll station “Pakovraće“, while 10,529 vehicles passed through the toll station “Preljina“, which is 40,8% less in comparison with the same period last year.

The new toll station “Pakovraće“ was built as part of the interchange at the settlement Pakovraće, it has six traffic lanes, including separate lanes for electronic toll collection.

All traffic participants will use the section from Preljina to Pakovraće for free, i.e., the toll price for those making exit at the toll station “Pakovraće“ will be the same as the one to the toll station “Preljina“.

The opening of the new motorway “Miloš Veliki” section for traffic will result in the reduction of congestions on the Čačak bypass, since all traffic participants in transit will use the new toll station, while everyone driving towards Čačak will choose one of these two toll stations.


Print