Works on the section from Preljina to Požega are being carried out in the full motorway profile, in the length of 30.96 km.
The roadway is an extension of the part of the motorway Е-763 through the Republic of Serbia – “Miloš Veliki”, which is under traffic from Surčin to Preljina.
Topographic and geomorphological conditions have imposed the necessity for designing and construction of three tunnels in total, 35 bridges in the total length of 5,196 metres, 4 overpasses in the total length of 592 metres, as well as the construction of 1,912,000 m 3 of embankment and two complete interchanges, which will enable relief of traffic on the existing Čačak bypass.
You may regularly monitor the progress in the construction of the motorway E-763 section, Preljina-Požega, every week, on the PE “Roads of Serbia” Youtube channel.
Watch and stay informed!
The last video footage from 17th June is on the link: