PE “Roads of Serbia“ is informing that, due to the execution of works on the adjustment of the Leg 3 with the newly-constructed interchange “Bubanj Potok“, on the segment of the Belgrade Bypass, on the I A category state road no.1, in the direction of Niš, traffic is flowing in a modified regime.
Traffic is flowing in the left lane in the zone of the former toll station “Bubanj Potok“ all the way to the exit for “IKEA“ (interchange “Tranšped“), which has led to the queuing of vehicles.
PE “Roads of Serbia“ is asking all traffic participants to be patient, adapt their speed to the road conditions and also obey the provided temporary traffic signage.