CONSTRUCTION OF BRIDGE OVER RIVER SAVA ON SECTION KUZMIN - SREMSKA RAČA

You may follow the progress of the construction of the motorway section Belgrade – Sarajevo, section Sremska Rača – Kuzmin, on the PE “Roads of Serbia”’s YouTube channel.  

The fifth phase of longitudinal launching of the bridge steel structure over the river Sava to the pylon in the river, towards the right bank, has been successfully completed. 

The longitudinal launching of the steel structure represents a very complex technological process, which implies the launching of 3,000 tons of steel from the left bank of the river Sava towards the right bank, i.e., from the Republic of Serbia to Bosnia and Herzegovina. 

Watch and stay informed!

You may watch the video on the link: 22.09.21. Construction of Bridge over River Sava on Section Kuzmin - Sremska Rača


Print