The President of the Republic of Serbia, Aleksandar Vučić, in the presence of the Minister of Construction, Transport and Infrastructure, Goran Vesić, acting director of PE "Roads of Serbia" Zoran Drobnjak and assistant directors Miodrag Poledica and Ivan Tejić, representatives of the local government and contractors, visited the final works on the construction of the new bridge in Petrovac on Mlava.
The bridge over the Mlava River in Petrovac is a cast, integral frame construction over three spans, with a total length of 58m. The width of the road is 8m, and together with the pedestrian and bicycle path it is 12.4m. The bridge is founded on 12 piles 15 m deep. A total of 1,000 m3 of concrete and 160 tons of reinforcement were installed in the structure. The total length of the constructed roads with the bridge is 190m.
You can watch the video material at: 29.08.23. President Vučić visited the final works on the construction of the new bridge in Petrovac na Mlava