SUBJECT: Notification on the installation of devices for on-line measurement of the time diagram for the consumption of active, reactive energy and temperature in characteristic facilities of the PE “Roads of Serbia”.
In accordance with the Contract no. VIII 454-912 from 25.06.2019, signed on the basis of Public procurement no.20/2019 for the requirements of creating the Program of Planned Maintenance of PERS Facilities, we installed the devices for on-line measurement of time diagram for the consumption of active, reactive energy and temperature in characteristic facilities of three PE “Roads of Serbia” tolling stations as follows:
- Tolling station “Inđija“
- Tolling station “Stara Pazova“
- Tolling station “Šimanovci“
The device installation lasted cca30 minutes each, per facility, without turning off the electric power, i.e. without bringing the tolling to a halt.
The devices are connected via Internet, using the “cloud” system so that one is able to observe the measurement at any location at any time, as well as perceive the time diagrams: P = f(t) electric energy consumption, Q= f(t) reactive energy consumption and temperature diagram T = f(t).
For monitoring the stated functions one needs to type in the following on their computer or mobile phone: