Management of PE “Roads of Serbia”, acting director Zoran Drobnjak and assistant director Miodrag Poledica, from Saturday to Saturday, visit the works on the construction of the E-763 Preljina - Požega highway, monitoring the dynamics and quality of the works.
Very frequent blockades by residents of the surrounding villages, who are mostly dissatisfied with property issues related to their plots and houses, as well as dissatisfaction with the access roads to their properties, lead to blockades of the execution of works, which directly affects the dynamics of execution.
But the presence, acting director Zoran Drobnjak, on the ground, in a conversation with the locals from Markovica (Lučani), an agreement was reached to remove the blockades by the locals.
All problems were solved directly on the field and blockages were removed, which is confirmed by photos.
And last Saturday, on June 8th, 2024 in direct talks with the locals from Krstač (Lucani), problems were also solved, because better traffic solutions were agreed for the deviations of local roads that were made during the construction of the E-763 Preljina - Požega highway.
Presence of the officials on the spot and direct talks of management and the locals are the way to solve all problems.