ACTING DIRECTOR OF PE “ROADS OF SERBIA” ZORAN DROBNJAK WITH ASSOCIATES ON A TOUR OF THE PAKOVRAĆA - POŽEG SECTION

Acting director of PE “Roads of Serbia” Zoran Drobnjak with his associates, visited on August 16th, 2024, the works on the construction of the E-763 highway, the Pakovraće - Požega section, with a length of 20 km.

Works are being carried out on the entire section in accordance with the agreed dynamics, as well as on sub-sections 4 and 5, on the electro-mechanical equipment of the Laz tunnel, the excavation of the “Munjino Brdo” tunnel.

Asphalting of the first layer of asphalt on subsection 4 (the section between the Laz and Munjino Brdo tunnels) is underway.

The monitoring of the execution of works and set deadlines continues.


Print