PE “Roads of Serbia” is informing that slower traffic flow is expected from Friday, 28th August until Sunday, 30th August, 2020, throughout the afternoon and the evening, on IA category state road no.1 (motorway E-75 Niš-Belgrade), in the direction of Belgrade, due to remedial works on the overpass, i.e. the pavement, in the zone of the interchange Umčari and on the section Mali Požarevac – Vrčin.
PE “Roads of Serbia” would like to emphasize that, in the works zone, traffic is flowing in a modified regime and is therefore appealing to all traffic participants to be patient, considering the construction season underway and that all the planned works need to be completed.
Variable message signs on the gantries on IA category state road no. 1, on the interchanges Umčari and Požarevac, are delivering information on the announced works.
We are appealing to traffic participants to be particularly cautious in the works zone, adapt their speed to the road conditions, keep a safe following distance and obey the provided temporary traffic signage.